Steps to Reproduce
  1. addTimeline to a blueprint (right click in event graph, type in "Add Timeline") 
  2. open timeline (double click the node)
  3. notice default timeline length is 5.00
  4. change it to "2,20" with a "," as delimiter
  5. it jumps back to "2.00" as it doesnt convert it, which is annoying

It should work like this:

  1. add a float track, add a point.
  2. Change the time or value of the point to "2,20"
  3. it converts the text and sets the value to "2.20" correctly

 

Other places in the editor do this correctly, and it is annoying for users outside of the US that use "," as numeric delimiters much more often

Have Comments or More Details?

There's no existing public thread on this issue, so head over to Questions & Answers just mention UE-198752 in the post.

0
Login to Vote

Unresolved
ComponentUE - Editor
Affects Versions5.3
CreatedOct 23, 2023
UpdatedOct 30, 2023
View Jira Issue